Call us: +44 870 8 200 310
Or write: experts@regartis.com
Monitor substances in REACH with EcoMole Watchdog.
Where available, the following national limit values, including the legal basis of each of them, which are currently applicable in the Member State in which the safety data sheet is being provided shall be listed for the substance or for each of the substances in the mixture. When listing occupational exposure limit values, the chemical identity as specified in Section 3 shall be used:
8.1.1.1. the national occupational exposure limit values that correspond to Union occupational exposure limit values in accordance with Directive 98/24/EC, including any notations as referred to in Article 2(3) of Commission Decision 2014/113/EU ( 36 );
8.1.1.2. the national occupational exposure limit values that correspond to Union limit values in accordance with Directive 2004/37/EC, including any notations as referred to in Article 2(3) of Decision 2014/113/EU;
8.1.1.3. any other national occupational exposure limit values;
8.1.1.4. the national biological limit values that correspond to Union biological limit values in accordance with Directive 98/24/EC, including any notations as referred to in Article 2(3) of Decision 2014/113/EU;
8.1.1.5. any other national biological limit values.
Information on currently recommended monitoring procedures shall be provided at least for the most relevant substances.
If air contaminants are formed when using the substance or mixture as intended, applicable occupational exposure limit values and/or biological limit values for these shall also be listed.
Where a chemical safety report is required or where a DNEL as referred to in Section 1.4 of Annex I or a PNEC as referred to in Section 3.3 of Annex I is available, the relevant DNELs and PNECs for the substance shall be given for the exposure scenarios from the chemical safety report set out in the annex to the safety data sheet.
Where a control banding approach is used to decide on risk management measures in relation to specific uses, sufficient detail shall be given to enable effective management of the risk. The context and limitations of the specific control banding recommendation shall be made clear.